Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Frito-Lay Warehouse

Jul 17 2024

New construction of 8,000sf warehouse facility in the Wilson Industrial Park in Barre, VT. With a focus on energy efficiency and durability, this new warehousing and distribution facility exceeds project goals for functionality and comfort. A cost-effective Pre-Engineered Metal Building (PEMB) approach, with a high R-value Insulated Metal Panel (IMP) envelope, this building was weather-tight […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Energy Efficient Construction, Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

Runamok Maple

Sep 20 2018

Renovation of existing 50,000 sf Pre-Engineering Metal Building (PEMB) to accommodate a growing Vermont-based maple producer’s production, packaging, product development, and fulfillment requirements. Transformation from a industrial woodworking facility to a food-safe production facility required extensive treatments to floors, ceiling and new enclosures. The mechanical, electrical, fire protection, and plumbing systems were replaced and upgraded. […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Construction Management, Energy Efficient Construction, Food Manufacturing Construction, Food Processing Facility, Occupied Renovation, Pre-Engineered Metal Building (PEMB), Vermont Construction

Lake Champlain Chocolates

Dec 20 2017

15,000 sf of renovation to a fully occupied, active chocolate manufacturing facility. Pre-task planning and careful monitoring were integral parts of daily construction activities to ensure air quality standards were met in the adjacent occupied warehouse and process factory spaces. The use of negative pressure air machines and robust isolation measures provided additional preventative measures. […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Construction Management, Energy Efficient Construction, Food Manufacturing Construction, Occupied Construction, Vermont Construction

UVM Rescue

Dec 19 2017

New construction of a 4,500 sf USGBC LEED Gold-certified facility, designed to provide a long-awaited new home for the University of Vermont Rescue Team. This highly energy efficient pre-engineered metal building accommodates up to eight (8) crew members with sleeping, bathing, cooking, dining, and training spaces for 24 hour staffing needs. The facility’s apparatus bay […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Design/Build, Energy Efficient Construction, LEED Certified, Pre-Engineered Metal Building (PEMB), Public Safety Building

Caledonia Spirits

Dec 07 2017

New Construction of over 27,000 sf of new production, administrative, retail and community spaces for this growing distillery operation Caledonia Spirits was looking to expand and relocate to provide a vibrant entertainment and Vermont-made product destination within walking distance of historic downtown Montpelier. Energy efficiency, durability, and value have been carefully weighed at each decision […]

Filed Under: Featured Project Tagged With: Commercial Construction, Construction Management, Distillery Construction, Energy Efficient Construction, High Performance Building, Manufacturing Construction, Pre-Engineered Metal Building (PEMB), Process Facility Construction

BioTek Instruments

Jul 10 2017

A 21,000 sf, 2- story addition as well as renovations to an existing 30,000 sf manufacturing/assembly facility. This project required careful and detailed planning to ensure that no disruption occurred to the existing facility’s operation, as extensive site work and the addition’s structure were constructed adjacent to sensitive, occupied assembly and office space. The addition […]

Filed Under: Featured News, News Tagged With: Commercial Construction, Commercial Office Construction, Energy Efficient Construction, Manufacturing Construction, Occupied Construction, Occupied Renovation, Office Construction, Pre-Engineered Metal Building (PEMB)

Smugglers’ Notch Fun Zone 2.0

Jun 09 2017

Smuggler's Notch Fun Zone

New construction of a 26,000 sf pre-engineered metal building to house Smugglers’ Notch Resort’s new Fun Zone 2.0 Neagley & Chase constructed the metal building shell for the resort’s new facility which consists of two zones, a cafe with food and beverages, and two private party rooms. The lower zone is called the “Go Zone” […]

Filed Under: News Tagged With: Commercial Construction, Pre-Engineered Metal Building (PEMB)

Autumn Harp

Oct 16 2015

A new 57,600 sf warehouse and distribution facility for an innovative custom manufacturer in the cosmetics and skincare industry Autumn Harp is a specialized cosmetics manufacturing partner, with certified organic and natural formulations, water based technology, and color cosmetics among its products sold in over 60 countries. This expansive warehouse facility, located on its Main Plant […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Design/Build, Energy Efficient Construction, Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

Revision Military Eyewear

Oct 16 2015

A 40,000 SF facility housing the offices, manufacturing, assembly, and R&D laboratories for advanced soldier protective systems This state-of-the-art facility for Revision needed to meet the high standards of a leading-edge military manufacturer while minimizing disruption to ongoing operations. Construction included injection molding manufacturing, which is utilized in slab piping trenching to provide flexibility, and […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Design/Build, Energy Efficient Construction, Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

Schluter Systems: UMS Manufacturing

Oct 16 2015

A new 73,500 SF warehouse, constructed adjacent to an existing manufacturing, warehouse and distribution facility. This expansion project required thorough planning and close coordination to mitigate any disruption to the sensitive manufacturing processes and distribution activities adjacent to the construction. Proactive problem solving was also required to meet the unique challenges of the site and […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Energy Efficient Construction, Manufacturing Construction, Occupied Renovation, Pre-Engineered Metal Building (PEMB)

Freedom Foods

Aug 31 2015

A state-of-the-art food processing facility uniquely designed to accommodate the changing needs of multiple artisan food producers Freedom Foods, in addition to producing its own products, works with artisan food manufacturers to develop, produce, and package their products. To meet the needs of multiple, flexible production areas that must be sealed and positively pressurized to […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Design/Build, Energy Efficient Construction, Food Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

King Arthur Flour

Aug 31 2015

An energy-efficient flour packaging facility with warehouse and supporting office space, to accommodate the growth of this iconic Vermont food manufacturer This 23,000 SF manufacturing facility for King Arthur Flour utilizes a number of energy efficient features. Solar tracking skylights, combined with daylighting technologies, maximize natural light and minimize the use of electricity in the […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Design/Build, Efficiency Vermont, Energy Efficient Construction, Food Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

Williston Dept. of Public Works

Aug 31 2015

A durable and energy-efficient 30,000 SF design/build of a Public Works garage for a growing Vermont town This new Public Works building includes a 20,000 SF truck bay, 7,500 SF of maintenance shops, and a 7,500 SF salt shed. It also includes offices for sewer, water, and highway departments, meeting rooms, storage space, a kitchen/dining […]

Filed Under: Uncategorized Tagged With: Design/Build, Efficiency Vermont, Energy Efficient Construction, Pre-Engineered Metal Building (PEMB), Public Works Garage Construction

Magic Hat Brewery

Aug 31 2015

A 7,500 SF expansion and renovation of a fully occupied, active brewery facility, including the construction of a mezzanine space designed to accommodate 20-foot-tall brewing tanks To keep this Vermont brewery and popular tourist destination running smoothly, selective demolition was needed to accommodate the new construction, which involved close coordination with ongoing brewing production and […]

Filed Under: Uncategorized Tagged With: Brewery Construction, Commercial Construction, Construction Management, Food Manufacturing Construction, Occupied Renovation

Schluter Systems: SSF Production

Aug 31 2015

A project consisting of two new facilities — a 29,000 SF warehouse and a 20,000 SF manufacturing facility — for a sophisticated foam backing product The construction of this project occurred in two phases: a warehouse facility followed by a manufacturing facility. To limit the impact of construction on the existing operations on this large […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Construction Management, Energy Efficient Construction, Manufacturing Construction, Pre-Engineered Metal Building (PEMB)

Vermont Castings

Aug 31 2015

Completed renovations and additions to an existing 80,000 SF foundry and manufacturing facility that operates around the clock, seven days a week The primary focus of this project for Vermont Castings was to provide significant improvements to safety and productivity without impacting the ongoing manufacturing activity within the facility. Close coordination and detailed day to […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Construction Management, Energy Efficient Construction, Manufacturing Construction, Occupied Renovation, Pre-Engineered Metal Building (PEMB), Thermal Envelope Construction

LOGIC Supply

Aug 31 2015

A large 2-story addition, along with complete interior space alterations, to an existing 15,000 SF industrial building Previously constructed by Neagley & Chase, this facility was in need of expansion due to company growth. The 21,000 SF building addition includes space for assembly, engineering, marketing, customer service, and warehouse, with the ability to convert the […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Construction Management, Energy Efficient Construction, Manufacturing Construction, Occupied Renovation, Office Construction

von Trapp Brewery & Beer Hall

Aug 31 2015

A complete brewery operation and adjoining Beer Hall, with storage and fermentation tanks specially designed for Austrian craft lagers Located at the world-famous Trapp Family Lodge in Stowe, Vermont, von Trapp Brewing produces an array of year-round and seasonal lagers, with a capacity of up to 50,000 barrels of beer annually. Lager beers pose a […]

Filed Under: Featured News, News Tagged With: Beer Hall, Brewery Construction, Commercial Construction, Construction Management, Energy Efficient Construction, Food Manufacturing Construction, Pre-Engineered Metal Building (PEMB), Restaurant

NCC leadership Mark Neagley, Rob Higgins, Andrew Martin

NCC construction workerNCC construction workerNCC construction workerNCC construction workersthermal scan testNCC construction workerNCC construction workerblower door test

About Neagley & Chase

Building on over 40 years of successful project delivery, our company has grown significantly in both depth and experience, and new technologies have advanced our capabilities, productivity, and ... Read more »

Neagley & Chase News

Recently Completed: Enfield Public Safety – Enfield, NH

In The Works: Fletcher Free Library Historic Restoration

Sustainability Spotlight: Final Blower Door Test Results Central & Main Apartments

In The Works: Speranza Housing, Barre, VT

New Team Member: Welcome Kyle Davis, Project Engineer

View All »

We’re hiring!

Immediate Openings

  • Field Engineer
  • Project Engineer / PE Development Program
  • Project Superintendent
  • Construction Laborers
  • Skilled Commercial Carpenters

Ongoing Openings

  • Project Estimator
  • Senior Project Manager

Featured News

Recently Completed: Enfield Public Safety – Enfield, NH

Congratulations to the entire Enfield Public Safety Project team! The Town of Enfield, NH, now has a state-of-the-art 15,000-square-foot Public Safety Facility, a collaborative effort by NCC and Black River Design Architects. This design-build project consolidates... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2025 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset