Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

BioTek Instruments

Jul 10 2017

Project Details:

Location:
Winooski, VT

Project Overview:

A 21,000 sf, 2- story addition as well as renovations to an existing 30,000 sf manufacturing/assembly facility.

This project required careful and detailed planning to ensure that no disruption occurred to the existing facility’s operation, as extensive site work and the addition’s structure were constructed adjacent to sensitive, occupied assembly and office space. The addition consisted of a highly efficient 4” metal panel envelope with triple glazed window systems.
Site work consisted of extensive expanded storm drainage, relocated utilities and expanded parking and access drives, and new loading docks.
A phased renovation of the existing 30,000 sf facility provided new electrical switch gear and associated distribution, new LED lighting, fire alarm system upgrade, HVAC system upgrades, new humidification systems and expanded deionized water system. New and renovated manufacturing assembly areas were provided with a ceiling located power/data, and compressed air distribution grid system to provide flexibility for future reconfiguration requirements.

« Return to Case Study Gallery
Services provided: Commercial Construction / Commercial Office Construction / Energy Efficient Construction / Manufacturing Construction / Occupied Construction / Occupied Renovation / Office Construction / Pre-Engineered Metal Building (PEMB) /

Project Photos:


News categories

  • Awards
  • Company News
  • Featured News
  • Featured Project
  • Media
  • News
  • Uncategorized

Recent News

  • New Team Member: Welcome Kyle Davis, Project Engineer
  • New Project: Brighton WWTF Upgrades
  • Recent Promotion: Phil Eseppi
  • Sustainability Spotlight: Fox Run Housing Interim Blower Door Test Results
  • New Project: North Hero Water Storage Tank

Featured News

New Team Member: Welcome Kyle Davis, Project Engineer

NCC is thrilled to announce the addition of our newest team member Kyle Davis. Kyle brings a great depth of experience, a detail-oriented approach, and wonderful focus on high-performance construction to his role as Project Engineer.... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2025 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset