Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Sustainability Spotlight: Final Blower Door Test Results Central & Main Apartments

May 23 2025

We are wrapping up the Central & Main Apartments project in Windsor and the Team is celebrating some fantastic blower door test results!

Central & Main is a large multi-story building with three levels of housing over an open parking garage. There were many critical air barrier details to work through with the design and subcontract team, and it looks like we all knocked it out of the park…final results exceeded Passive House air tightness standards with a result of  .042 CFM/SF at 50 Pa.

You can learn more about the project and see completed project photos here soon: Central & Main Apartments

Congratulations to the entire Central & Main team!

Filed Under: Company News, Featured News, News Tagged With: affordable housing, Air Tight Construction, Construction Management, High Performance Building

News categories

  • Awards
  • Company News
  • Featured News
  • Featured Project
  • Media
  • News
  • Uncategorized

Recent News

  • Preservation Burlington Award Fletcher Free Library
  • Recently Completed: BBCO Wastewater Pretreatment System – Williston, VT
  • 2026 Vermont Business Growth Award
  • Recently Completed: Chipotle Mexican Grill – Berlin, VT
  • Recently Completed: Dartmouth College Rockefeller Center – Hanover, NH

Featured News

Preservation Burlington Award Fletcher Free Library

NCC is thrilled to announce that the Fletcher Free Library Historic Facade Restoration project has received the 2026 Institutional Award from Preservation Burlington. The historic “Carnegie Wing” of Burlington’s Fletcher Free Library, built in 1904, underwent a... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2026 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset