Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Schluter Systems: SSF Production

Aug 31 2015

Project Details:

Location:
Plattsburgh, NY
Project Type:
Warehouse & Manufacturing Facilities / PEMB
Learn more about PEMB »
Our design-build process »

Project Overview:

A project consisting of two new facilities — a 29,000 SF warehouse and a 20,000 SF manufacturing facility — for a sophisticated foam backing product

The construction of this project occurred in two phases: a warehouse facility followed by a manufacturing facility. To limit the impact of construction on the existing operations on this large manufacturing campus, our initial site work required the detailed coordination of a scheduled relocation of Schluter Systems’ existing utilities.

As problematic soils were found to exist in the footprint of the new warehouse facility, dynamic compaction was utilized as a cost- and schedule-efficient solution. Closely located and adjacent to production and warehouse facilities, the project required coordinated site logistics and careful access planning to ensure a smooth process and successful completion.

« Return to Case Study Gallery
Services provided: Commercial Construction / Construction Management / Energy Efficient Construction / Manufacturing Construction / Pre-Engineered Metal Building (PEMB) /

Project Photos:


Industries Served

  • Food & Beverage
  • Manufacturing
  • Education
  • Healthcare
  • Office/Commercial
  • Housing
  • Water/Wastewater

Featured News

Recently Completed: GlobalFoundries Dining & Event Spaces – Essex Junction, VT

Congratulations to GlobalFoundries and the entire project team on the completion of another successful Employee Experience Project phase. NCC is excited to share that it has recently completed the transformation of both the Dining and Event... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2026 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset