Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
  • Contact

Village Center Apartments

Sep 30 2020

NCC is working with the Lamoille Housing Partnership and Evernorth to bring 24 new units of affordable housing to downtown Morrisville, VT. Situated on a sloped 1/4 acre vacant lot, within walking distance of all downtown amenities, this project requires extensive logistics and safety planning. A high performance envelope, advanced Minotair heat pump building system, […]

Filed Under: Featured Project Tagged With: affordable housing, Construction Management, Net Zero Building

Lincoln Place Housing

Sep 30 2020

Historic adaptive reuse and renovation of an existing two story masonry facility which was once the home of the Immaculate Heart of Mary School in Rutland, VT. This renovated facility provides 19 units of much needed affordable housing and community gathering spaces. Scope of renovation includes all new mechanical, electrical, and fire protection systems, the […]

Filed Under: Featured Project Tagged With: affordable housing, Construction Management, energy efficiency, net zero ready

Private Residence

Jul 07 2020

Beautiful new private residence tucked along the edge of meadow with sweeping views of the Adirondacks and Lake Champlain beyond. This net zero energy home is heated and cooled by a state-of-the-art heat pump system powered by an on-site PV array. A high performance envelope and triple pane windows ensure year round comfort. Beautiful local […]

Filed Under: Uncategorized Tagged With: Construction Management, Craftsmanship, Custom Homes, Efficiency Vermont, Energy Efficient Construction, High Performance Building, Net Zero Building, Vermont Construction

Wing Building

Mar 07 2019

This two story facility consisted of retail and commercial space on the lower level and a mix of single and two bedroom apartments on the upper level. The design, which incorporates a creative use of exterior building materials and façade details, reflects the former sheds of the Vermont Railways located along Burlington’s waterfront.

Filed Under: Featured Project Tagged With: Construction Management, Housing Construction, Mixed Use Construction

Vergennes Community Housing

Mar 07 2019

The Vergennes Community Housing project is a joint development effort by the Addison County Community Trust and Housing Vermont to provide 24 new units of affordable housing stock for Addison County. This project includes 24 family rental apartments, with building amenities including a community library and laundry room. This highly energy efficient and environmentally sustainable […]

Filed Under: Featured Project Tagged With: Construction Management, Energy Efficient Construction, High Performance Building, Housing Construction, Vermont Construction

Cornerstone Building

Mar 07 2019

A five story (two levels of structured parking with three levels above of mixed use), commercial and retail space on the ground floor level, and two levels of market rate housing on the upper two floors. The facility was constructed over a new two level below grade parking structure. A combination of brick, stained cedar […]

Filed Under: Featured Project Tagged With: Commercial Construction, Construction Management, Downtown Construction, Housing Construction

Champlain Valley Cohousing

Mar 07 2019

Multi-family units consisting of 2-story, two and three bedroom triplex and quadplex community housing. In addition to these very energy efficient living units, this environmentally sustainable community includes all of the infrastructure necessary for a “neighborhood”; roads, communal sewer, communal water service, and storm water control.

Filed Under: Featured Project Tagged With: Construction Management, High Performance Building, Housing Construction

The Cliffs

Mar 07 2019

This project consisted of the complete restoration and 10,000 sf renovation of the East Building; as well as the demolition and 10,000 sf rebuild of West Building. The beautiful East Building, is comprised of a 3-story building with a full basement, and was renovated to create five living units. The existing West Building was demolished […]

Filed Under: Featured Project Tagged With: Construction Management, Housing Construction

Gifford Independent Living Facility

Nov 02 2017

This three story, 77,000 sf facility consists of 49 living units and shared living spaces. A thermally efficient building envelope and highly efficient energy systems will provide comfort throughout both heating and cooling seasons. The facility offers a mix of studio, one-bedroom, and two-bedroom apartments designed to meet the specific needs of seniors. Shared living spaces include a library, fitness center, dining room, lounges, sunroom, and […]

Filed Under: Uncategorized Tagged With: High Performance Building, Housing Construction, Independent Living Facility

neagley-and-chase-leaders

About Neagley & Chase

With a tradition of excellence and a focus on the future, we’re building on a record of success for companies of all sizes throughout northern New England. Our history In 1984, Mark R. Neagley ... Read more »

Neagley & Chase News

Sustainability Spotlight: VNRC Project Wins Better Buildings By Design Award

New Team Member: Jim Maloney, Project Manager

Celebrating the Completion of Vermont Federal Credit Union (VFCU) Headquarters

New Team Member: Ryan LaCasse

Celebrating the Completion of Champlain Valley Oral & Maxillofacial Surgery (CVOMS)

View All »

Featured News

Sustainability Spotlight: VNRC Project Wins Better Buildings By Design Award

Congratulations! Congratulations to the entire Project Team on the recent Efficiency Vermont Best of the Best Award for the VNRC... Read more »

Testimonials

Over the years, Neagley & Chase has been a vital asset in our ongoing corporate growth.  From the top down, we have always had the full, personal attention of those engaged in understanding our needs and bringing those needs to reality. They are more than our contractors. They have an intuitive understanding of our company culture and its rhythms, working alongside of us as easily as can be imagined.”

Lisa Groeneveld, COO
Logic Supply, Inc.

Neagley & Chase Construction Co. has been an active part of our many expansions over the past eight years. Starting in 2007 with the original building and fit-up and through several additions and renovations, our needs have always been met, by the same Team, with professional focus. When they say they want to build long-term relationships, I assure you, their interest in your well-being is validated by their performance.”

Eric Hounchell, Vice President Optics
Revision Eyewear

Our building is functioning fully as intended and we couldn’t be more pleased with how the whole project went. Your team’s performance was top notch, and made the extra effort to ensure that the quality, specs, and usability were what we needed. As King Arthur grows, I’m confident we will remember your company’s strong performance in creating our manufacturing space.”

Steve Voigt, President/CEO
King Arthur Flour Company, Inc.

Neagley & Chase took the time to understand our systems and needs, created a schedule that integrated those needs, and delivered the work as promised. Their size and hands-on approach, attributed to excellent communication from the top down, made us all feel like part of a singular team. The thoroughness of their planning and execution allowed our team to continue doing what we do best.”

Lloyd Grunvald, General Manager
Preci Manufacturing Inc.

Without a doubt, Neagley & Chase Construction Company proved to be the best choice we could have made when selecting a firm to help with a recent 57,600 sf expansion on our Main Plant Campus. The planning, scheduling and construction proceeded flawlessly. As promised, a well built, energy efficient facility was turned over in 3 ½ months. Thank you for a job exceedingly well done.”

David Logan
Autumn Harp Chairman

Having more than 44 years experience in similar projects, I recognized the need to assemble a team that could meet our financial and quality objectives while staying on schedule. Project Manager Robert Higgins and Project Superintendent Christopher Minadeo proved to be very well qualified and most valuable members of the project team. They, along with the N&C organization and their excellent subcontractors, are commended for the successful completion of our new facility.”

William H. Baumann, Jr., P.E.
Freedom Foods, LLC

The Neagley & Chase team did an outstanding job of coordinating with our design team, our LEED consultant, and our facility operations staff, working through design details and construction sequencing with minimal involvement by our team. Based on the strength of their performance on the UMS facility, we selected NCC as our Construction Manager for our subsequent expansion. Their team has allowed us to remain focused on the growth and needs of our business.”

C. J. Madonna, Esq. General Counsel
Schluter Systems LP

Projects that include a mix of new and rehab construction are a particular challenge. Both sites were very tight, permitted under stringent guidelines, and required extensive coordination with subcontractors to meet our goal of creating long lasting, very energy efficient buildings. Efficient Vermont has awarded both buildings a 5-Star rating – indicative of the good oversight and care that went into coordinating this work.”

Rich Wickman, Project Manager
Housing Vermont

Efficiency Vermont has worked with Neagley & Chase for many years and can confirm their knowledge of, and experience with, the design and construction of high-performance buildings. On each project they are involved with, they strive for both the highest energy efficiency and cost-effectiveness, which is key to achieving a net zero energy building.”

Nicholas Thiltgen, Commercial Energy Consultant
Efficiency Vermont

“Neagley & Chase has now done two major expansion projects for us. They were unfailingly cooperative and solicitous of our operational needs, and we did not miss a beat in our regular activities – no easy feat given the scope of work and our schedule of daily and special events.”

Jed Graef
Vermont Zen Center

I want to thank you for the professional manner in which you service Wake Robin. Working in a community such as this presents many challenges that you’ve continued to overcome. The overwhelming theme is how respectful your field personnel treat our residents, and how clean a project they run. From my standpoint, the projects have been a success due to the quality of the work and the timely response of management.”

Wayne Symon, Project Manager
Wake Robin Facilities

“NCC combined their extensive knowledge of renovation with the needs of a school in session. Workers and managers worked around students and staff with humor and flexibility. The experience was full of positive, unexpected intersections of two usually distinct populations. If we were to do it all over again, Neagley & Chase would be our pick, hands down.”

Tory Riley, Principal
Lincoln Community School

“From start to finish, Neagley & Chase supported and surrounded our relocation project with their expertise.  This project ran with timely meetings, detailed information and great workmanship.   N&C had a fairly tight time frame within which to accomplish the work and they managed to come in both on time and on budget.  I would highly recommend Neagley and Chase to other business who have office expansion and fit up needs.”

Tim Rushford, Owner/Founder
Peds One

“The Neagley & Chase team was committed to the Performance Center meeting the Passive House air tightness standard of 0.05 CFM50/sf. There were challenges along the way: Winter, new products, and materials not performing as expected. They adapted to every challenge with innovation and attention to detail. The building surpassed the target at 0.027 CFM50/sf. Nice work NCC!”

Jon Haehnel, Director of Building Envelope Services
BVH Integrated Services, P.C.

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

Employee PortalCopyright © 2022 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group