Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Ausable Club

Nov 08 2022

Restoration of the historic Ausable Club to ensure generations of continued use and enjoyment. Extensive scope of roof restoration included removal of existing asphalt shingle roofing, replacement of damaged roof sheathing, restoration of dormers, chimneys, roof ventilators and architectural dome. New standing seam metal roofing and trim were installed, as well as a first-floor addition […]

Filed Under: Uncategorized Tagged With: Construction Management, Historic Restoration, Hospitality

Champlain College McDonald Hall

Sep 21 2022

Originally built as a single-family residence in 1897, this beautiful historic masonry structure on the Champlain College campus hosts nearly 9,000sf of living area. Four levels total, this renovation will provide 45 dormitory beds for Champlain College’s Burlington, VT campus. Student amenities include beautifully restored historic finishes, bathrooms on each level, a first-floor lounge with […]

Filed Under: Featured Project Tagged With: Campus Construction, Construction Management, Historic Preservation, Historic Renovation

Vermont Natural Resources Council (VNRC) Headquarters

Oct 18 2021

Historic Restoration & Adaptation of the Vermont Natural Resources Council (VNRC) Headquarters in Montpelier, VT. Project included a complete rehabilitation of a beautiful Federal Style residence built a few doors down from the State House in the late 1800’s. The scope of work included full thermal envelope and window upgrades, complete MEP systems replacement, site […]

Filed Under: Featured Project Tagged With: Construction Management, Energy Efficient Construction, High Performance Building, Historic Restoration, Low Embodied Carbon, Net Zero Building

Bellows Free Academy

Aug 27 2021

Occupied, multi-phased renovation and addition to address significant facility infrastructure, site and security deficiencies. Scope of work included the new construction of a connector to serve as a centralized entrance and reception area for the entire school campus. Site, utility, and parking infrastructure was reconfigured and upgraded across the campus to account for changed transportation […]

Filed Under: Uncategorized Tagged With: Education Construction, Historic Renovation, Vermont Construction

Lincoln Place Housing

Sep 30 2020

Historic adaptive reuse and renovation of an existing two story masonry facility which was once the home of the Immaculate Heart of Mary School in Rutland, VT. This renovated facility provides 19 units of much needed affordable housing and community gathering spaces. Scope of renovation includes all new mechanical, electrical, and fire protection systems, the […]

Filed Under: Uncategorized Tagged With: affordable housing, Construction Management, energy efficiency, net zero ready

Middlebury College Munroe Hall

Jul 19 2019

A full exterior and interior restoration of historic building on the Middlebury College campus. Scope of exterior renovation work includes the restoration of existing masonry facade, installation of new high performance windows and doors, and rebuild of main entrances. Site improvements to address both upgrades to underground utilities, new perimeter drainage, and site accessibility are […]

Filed Under: Uncategorized Tagged With: Campus Construction, Education Construction, Energy Efficient Construction, High Performance Building, Historic Renovation, Historic Restoration, Vermont Construction

The Cliffs

Mar 07 2019

This project consisted of the complete restoration and 10,000 sf renovation of the East Building; as well as the demolition and 10,000 sf rebuild of West Building. The beautiful East Building, is comprised of a 3-story building with a full basement, and was renovated to create five living units. The existing West Building was demolished […]

Filed Under: Uncategorized Tagged With: Construction Management, Housing Construction

Shelburne Community Center and Library

Feb 01 2019

New construction of  library building and renovation of the historic Town Hall. Building a 21st century library, while conserving the historic Shelburne Town Hall, the new facility addresses existing site, programming, accessibility and energy efficiency issues while achieving a net-zero ready standards and maximizing flexibility and future community use. The renovations to the Town Hall […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Community, Construction Management, Efficiency Vermont, Energy Efficient Construction, High Performance Building, Net Zero Building, Renovation, Vermont, Vermont Construction

Vermont Public Radio

Sep 02 2015

VPR headquarters

An expansion and renovation to VPR’s existing headquarters and broadcast studios, effectively doubling the space of the existing facility Vermont Public Radio’s facility has been designed to achieve maximum energy efficiency, as part of Efficiency Vermont’s Net Zero pilot program — utilizing air source heat pumps, solar panels, and high-efficiency lighting, so that the facility […]

Filed Under: Featured News, News Tagged With: Broadcasting Studio Construction, Commercial Construction, Construction Management, Energy Efficient Construction, Net Zero Building, Occupied Renovation, Office Construction, Pre-construction Services, Thermal Envelope Construction

NCC leadership Mark Neagley, Rob Higgins, Andrew Martin

NCC construction workerNCC construction workerNCC construction workersNCC construction workerNCC construction workerblower door testthermal scan testNCC construction worker

About Neagley & Chase

With a tradition of excellence and a focus on the future, we’re building on a record of success for companies of all sizes throughout northern New England.In 1984, Mark R. Neagley founded the Neagley ... Read more »

Neagley & Chase News

New Team Member: Welcome Kyle Davis, Project Engineer

New Project: Brighton WWTF Upgrades

Recent Promotion: Phil Eseppi

Sustainability Spotlight: Fox Run Housing Interim Blower Door Test Results

New Project: North Hero Water Storage Tank

View All »

We’re hiring!

Immediate Openings

  • Field Engineer
  • Project Engineer / PE Development Program
  • Project Superintendent
  • Construction Laborers
  • Skilled Commercial Carpenters

Ongoing Openings

  • Project Estimator
  • Senior Project Manager

Featured News

New Team Member: Welcome Kyle Davis, Project Engineer

NCC is thrilled to announce the addition of our newest team member Kyle Davis. Kyle brings a great depth of experience, a detail-oriented approach, and wonderful focus on high-performance construction to his role as Project Engineer.... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2025 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset