Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Vermont Public Radio

Sep 02 2015

VPR headquarters

Project Details:

Location:
Colchester, VT
Project Type:
Expansion and Renovation

Project Overview:

An expansion and renovation to VPR’s existing headquarters and broadcast studios, effectively doubling the space of the existing facility

Vermont Public Radio’s facility has been designed to achieve maximum energy efficiency, as part of Efficiency Vermont’s Net Zero pilot program — utilizing air source heat pumps, solar panels, and high-efficiency lighting, so that the facility produces more energy than it consumes. The expansion includes a new state-of-the-art studio for broadcasts, Internet streaming, and live performances.

This challenging project required careful planning and investigation during the preconstruction process, to ensure that construction activities did not impact the radio station’s broadcast quality. Creative solutions were developed to mitigate potential noise issues that were identified in early testing of simulated construction activities.

The last phase of the project was the renovation of VPR’s existing facility, a former veterinarian hospital constructed in 1908 within the Fort Ethan Allen complex.

« Return to Case Study Gallery
Services provided: Broadcasting Studio Construction / Commercial Construction / Construction Management / Energy Efficient Construction / Net Zero Building / Occupied Renovation / Office Construction / Pre-construction Services / Thermal Envelope Construction /

Project Photos:


News categories

  • Awards
  • Company News
  • Featured News
  • Featured Project
  • Media
  • News
  • Uncategorized

Recent News

  • Recently Completed: Turning Point Center of Central Vermont
  • New Team Member: Collin Shanahan, Project Superintendent
  • New Project: Innovation Lane 3 Housing – Burlington, VT
  • Recently Completed: Fletcher Free Library Restoration – Burlington, VT
  • NCC Team Member: Welcome Jacob Adams, Project Engineer

Featured News

Recently Completed: Turning Point Center of Central Vermont

Please join us in celebrating the recent completion of the Turning Point Center of Central Vermont! The complete restoration of the existing historic portion of the building, paired with a new energy-efficient addition, has absolutely transformed... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2026 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset