Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Delivering a High-Performance Envelope

Apr 08 2019

Neagley & Chase Construction is pleased to have recently completed, and to be nearing completion, on several innovative high-performance and sustainable projects, including Vermont Public Radio, the North Country School Walter P. Breeman Performing Arts Center, and the Shelburne Community Library.

Key to the success of these energy efficient facilities has been the emphasis placed on ensuring a robust envelope that meets rigorous air infiltration standards. The following planning and implementation steps have been critical to the success in delivering these high-performance envelopes:

  • Constructability reviews during preconstruction: Conducting a thorough review and gaining a complete understanding of the materials, details, and sequencing of the wall assembly. Working closely with the Design Team to inform and adjust for performance, cost and constructability benefits.
  • Mock-up of exterior wall assembly: Constructing a full-scale mock-up of the exterior wall assembly to include all materials; with a focus on material intersections and transitions, openings and penetrations, and inside and outside corners. Review and refinement of the mock-up with Design Team, Owner, and Sub-contractors.
  • Pre-installation meetings: Focused pre-installation meetings with the building envelope consultant and trades working on the exterior wall assembly, from the concrete subcontractor through the finish siding installer, to work out consistent, certifiable installation techniques.
  • Isolated testing of key details/assemblies prior to final blower door testing: Involvement of an independent testing agency or envelope commissioning agent to provide progress testing of select building areas and key details. These efforts are further supplemented by the use of NCC’s own fog machine and our on-staff BPI certified professionals.
  • Constant quality control and observation: The value in providing continuous on-site training, observation, and quality control can not be overstated.

Although air-tight envelope construction is only one component of a high-performance and sustainable project, NCC is proud of the passion, skills, and success we have established to-date and look forward to next challenge.

Review of wall assembly mock-up

Isolated fog testing of wall plate detail

NCC Project Engineer Matt Tanneberger inspecting a roof edge air sealing detail

 

Filed Under: Featured News, News Tagged With: Construction Management, Energy Efficient Construction, High Performance Building, Net Zero Building

News categories

  • Awards
  • Company News
  • Featured News
  • Featured Project
  • Media
  • News
  • Uncategorized

Recent News

  • Recent Promotion: Chris Minadeo, Director of Field Operations
  • Recently Completed: Champlain College McDonald Hall
  • Recent Promotion: Kyle Curry, Assistant Project Manager
  • Sustainability Spotlight: Lincoln Place Housing Wins Best Builder Sustainability Award
  • Wishing Irene Daigle, a Very Happy Retirement!

Featured News

Recent Promotion: Chris Minadeo, Director of Field Operations

NCC is pleased to announce the promotion of Chris Minadeo to the role of Director of Field Operations. Chris has been an integral part of the NCC Team since 2003. With more than 25 years of... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

Copyright © 2023 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group