Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Burlington Beer Company Wastewater Pretreatment System

Oct 16 2026

Installation of new membrane bioreactor (MBR) wastewater pretreatment system, associated equipment, and new force main to pretreat the facility’s wastewater prior to discharge to the Town of Williston municipal infrastructure system. The project scope included installation of a new sump tank, pH control system, static screen, and membrane filtration module within the existing facility. An […]

Filed Under: Uncategorized Tagged With: Brewery Construction, Wastewater Treatment

Brighton WWTF Upgrades

Apr 21 2025

Scope of upgrades include the removal of existing pipe infrastructure from two lagoons. Additionally, de-watering and sludge removal of both of these lagoons. Following restoration of lagoons, installation of new piping and curtain. Scope also includes the construction of a new building which will contain administrative space, headworks, blowers, and a new chem feed room. […]

Filed Under: Uncategorized Tagged With: Wastewater Plant Upgrades

Hardwick Wastewater Treatment Upgrades

Sep 22 2022

Important upgrades for the Town of Hardwick’s Wastewater Treatment Plant including lagoon upgrades, mechanical, and electrical system upgrades. Lagoon work includes removal and replacement of existing liner, new aeration system, new lagoon cover, and aeration piping replacement. Upgraded blowers, interior piping, controls, rooftop fans, VFD’s, and replacement of the main electrical gear will ensure the […]

Filed Under: Uncategorized Tagged With: Wastewater Plant Upgrades

Dannemora Wastewater Treatment

Aug 31 2015

A facility upgrade consisting of a new influent pumping station and headworks building in upstate New York Dannemora’s headworks building houses critical screening and grit processing equipment, which is used to reduce the level of pollutants in incoming wastewater to a level that will allow it to be discharged — a complex industrial process. For […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Renovation, Wastewater Plant Upgrades

Williston Pump Stations

Aug 31 2015

A construction project consisting of improvements and upgrades to two existing pump stations within a municipal wastewater facility To accomplish the structural improvements to Williston’s pump stations, detailed pre-construction planning was a critical first step to ensure the safe, ongoing operation of the facility. Close communication with the plant operators was then required throughout the […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Renovation, Wastewater Plant Upgrades

Grand Isle Consolidated Water District

May 16 2015

A new addition to a wastewater treatment facility, designed to house a new granular activated carbon filtration system and associated process piping In constructing the addition and structural improvements to this municipal facility, a new state-of-the-art 38,000 gallon wet well was installed, along with new pumps, a new chemical feed system, and new 16-foot, 10,000 […]

Filed Under: Uncategorized Tagged With: Commercial Construction, Renovation, Wastewater Plant Addition, Wastewater Plant Upgrades

NCC leadership Mark Neagley, Rob Higgins, Andrew Martin

About Neagley & Chase

Building on over 40 years of successful project delivery, our company has grown significantly in both depth and experience, and new technologies have advanced our capabilities, productivity, and ... Read more »

Neagley & Chase News

2026 Vermont Business Growth Award

Recently Completed: Chipotle Mexican Grill – Berlin, VT

Recently Completed: Dartmouth College Rockefeller Center – Hanover, NH

Thank You Phoebe Richardson, Summer 2026 Intern

Recently Completed: Turning Point Center of Central Vermont

View All »

We're Hiring!

Project Engineer

Project Superintendent

Construction Laborers

Skilled Commercial Carpenters

PE Development Program

Internship Program

Featured News

Recently Completed: BBCO Wastewater Pretreatment System – Williston, VT

Congratulations to the Burlington Beer Company, and the entire project team, on the completion of this important process project. The project covered the installation of a new membrane bioreactor (MBR) wastewater pretreatment system, associated equipment, and... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2026 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset