Neagley + Chase Construction Company

  • tel: (802) 658-6320
  • email: info@neagleychase.com
  • About Us
    • Our People
    • Company News
    • Video Stories
    • Sustainability
    • Historic Preservation
  • Services
    • Pre-Construction
    • Construction Management
    • Design-Build
    • Special Projects Team
    • Real Estate Development
  • Industries
    • Food & Beverage
    • Manufacturing
    • Education
    • Healthcare
    • Office/Commercial
    • Housing
    • Water/Wastewater
  • Case Studies
  • Join Our Team
    • Careers
    • PE Development Program
    • Internship Program
  • Contact

Schluter Systems: UMS Manufacturing

Oct 16 2015

Project Details:

Location:
Plattsburgh, NY
Project Type:
Warehouse Facility Addition / PEMB
Learn more about PEMB »
Our design-build process »

Project Overview:

A new 73,500 SF warehouse, constructed adjacent to an existing manufacturing, warehouse and distribution facility.

This expansion project required thorough planning and close coordination to mitigate any disruption to the sensitive manufacturing processes and distribution activities adjacent to the construction. Proactive problem solving was also required to meet the unique challenges of the site and the aggressive schedule of the project.

Trucking distribution access, located in the footprint of the new facility, was maintained throughout construction. The new facility tied in to the existing building for access by both truck and forklift traffic, requiring reconfiguration and renovation of existing plant layout and traffic patterns.

This facility addition was designed and constructed to LEED Silver Certification requirements, and recently was awarded LEED Gold Certification.

« Return to Case Study Gallery
Services provided: Commercial Construction / Energy Efficient Construction / Manufacturing Construction / Occupied Renovation / Pre-Engineered Metal Building (PEMB) /

Project Photos:


Industries Served

  • Food & Beverage
  • Manufacturing
  • Education
  • Healthcare
  • Office/Commercial
  • Housing
  • Water/Wastewater

Featured News

In The Works: Fletcher Free Library Historic Restoration

Another wonderful Burlington Historic Preservation project is underway! The historic “Carnegie Wing” of Burlington’s Fletcher Free Library, built in 1904, has just begun a significant restoration of its key envelope components. This vital project aims to... Read more »

neagley-chase-logo-reverse

Meadowland Business Park
66 Bowdoin St #100
South Burlington, Vermont 05403
View Map »

(802) 658-6320

  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS

ACG LogoCopyright © 2025 Neagley & Chase Construction Company • Log in
Meadowland Business Park, 66 Bowdoin St. #100, South Burlington, Vermont 05403
Website by Stride Creative Group

Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset