<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Neagley &#38; Chase Construction</title>
	<atom:link href="http://www.neagleychase.com/blog/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://www.neagleychase.com/blog</link>
	<description>Neagley &#38; Chase Construction</description>
	<lastBuildDate>Tue, 31 May 2011 20:48:08 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.3</generator>
		<item>
		<title>Chazy Central School District &#8211; Chazy, NY</title>
		<link>http://www.neagleychase.com/blog/?p=4</link>
		<comments>http://www.neagleychase.com/blog/?p=4#comments</comments>
		<pubDate>Mon, 14 Mar 2011 16:05:29 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent Projects]]></category>

		<guid isPermaLink="false">http://www.neagleychase.com/blog/?p=4</guid>
		<description><![CDATA[<p><a rel="attachment wp-att-16" href="http://www.neagleychase.com/blog/?attachment_id=16"><img class="alignnone size-full wp-image-16" title="i_chazy" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_chazy-e1300129027663.jpg" alt="" width="200" height="120" /></a>Neagley &#38; Chase Construction Company is the general contractor on this $5-milion multi-prime renovation project. This two year project includes new windows, roof, flooring, ceiling, heating and controls throughout the entire building. Project is scheduled to be completed September, 2010.&#8230;</p>]]></description>
			<content:encoded><![CDATA[<p><a rel="attachment wp-att-16" href="http://www.neagleychase.com/blog/?attachment_id=16"><img class="alignnone size-full wp-image-16" title="i_chazy" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_chazy-e1300129027663.jpg" alt="" width="200" height="120" /></a>Neagley &amp; Chase Construction Company is the general contractor on this $5-milion multi-prime renovation project. This two year project includes new windows, roof, flooring, ceiling, heating and controls throughout the entire building. Project is scheduled to be completed September, 2010. Project Superintendent is bruce Thompson.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.neagleychase.com/blog/?feed=rss2&amp;p=4</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Single Family Residence &#8211; Burlington, VT</title>
		<link>http://www.neagleychase.com/blog/?p=40</link>
		<comments>http://www.neagleychase.com/blog/?p=40#comments</comments>
		<pubDate>Mon, 14 Mar 2011 19:19:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent Projects]]></category>

		<guid isPermaLink="false">http://www.neagleychase.com/blog/?p=40</guid>
		<description><![CDATA[<p><a rel="attachment wp-att-41" href="http://www.neagleychase.com/blog/?attachment_id=41"><img class="alignnone size-full wp-image-41" title="i_project" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_project-e1300130385288.jpg" alt="" width="200" height="120" /></a>Construction of a new, single family home, approximately 4,500 square feet on beautiful Lake Champlain. Project includes demolition of existing home and rebuilding a new home with revisions to the existing lot. Project is underway and scheduled for completion in&#8230;</p>]]></description>
			<content:encoded><![CDATA[<p><a rel="attachment wp-att-41" href="http://www.neagleychase.com/blog/?attachment_id=41"><img class="alignnone size-full wp-image-41" title="i_project" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_project-e1300130385288.jpg" alt="" width="200" height="120" /></a>Construction of a new, single family home, approximately 4,500 square feet on beautiful Lake Champlain. Project includes demolition of existing home and rebuilding a new home with revisions to the existing lot. Project is underway and scheduled for completion in Spring, 2010.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.neagleychase.com/blog/?feed=rss2&amp;p=40</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The Ice Barn – Milton, VT</title>
		<link>http://www.neagleychase.com/blog/?p=27</link>
		<comments>http://www.neagleychase.com/blog/?p=27#comments</comments>
		<pubDate>Mon, 14 Mar 2011 19:01:13 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Recent Projects]]></category>

		<guid isPermaLink="false">http://www.neagleychase.com/blog/?p=27</guid>
		<description><![CDATA[<p><a rel="attachment wp-att-28" href="http://www.neagleychase.com/blog/?attachment_id=28"><img class="alignnone size-full wp-image-28" title="i_icebarn" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_icebarn-e1300129234150.jpg" alt="" width="200" height="120" /></a>Renovation/alteration of the existing Showtime building and addition of a new building, approximately 35,000 total square feet. Phase One consisted of renovation of the existing 8,000 square foot wood frame commercial building to include ceiling and carpet replacement, painting, blew&#8230;</p>]]></description>
			<content:encoded><![CDATA[<p><a rel="attachment wp-att-28" href="http://www.neagleychase.com/blog/?attachment_id=28"><img class="alignnone size-full wp-image-28" title="i_icebarn" src="http://www.neagleychase.com/blog/wp-content/myuploads/i_icebarn-e1300129234150.jpg" alt="" width="200" height="120" /></a>Renovation/alteration of the existing Showtime building and addition of a new building, approximately 35,000 total square feet. Phase One consisted of renovation of the existing 8,000 square foot wood frame commercial building to include ceiling and carpet replacement, painting, blew lighting, HVAC ductwork and diffusers. A portion of the asphalt shingle roof was removed and replaced to accommodate stairs and a handicap ramp. Phase Two consists of a 27,000 square foot metal building. Interior finishes of this phase include some block walled locker rooms in one corner of the space and a Zamboni and compressor room. Future Expansions are likely as permits allow for the addition to be up to 40,000 square feet. The Owner eventually wants to add a pool and outdoor recreation area to the complex as well. Projects is underway and scheduled for completion the end of September, 2009, in time for hockey season.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.neagleychase.com/blog/?feed=rss2&amp;p=27</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

