Neagley & Chase Construction Company is the general contractor on this $5-milion multi-prime renovation project. This two year project includes new windows, roof, flooring, ceiling, heating and controls throughout the entire building. Project is scheduled to be completed September, 2010. Project Superintendent is bruce Thompson.
Construction of a new, single family home, approximately 4,500 square feet on beautiful Lake Champlain. Project includes demolition of existing home and rebuilding a new home with revisions to the existing lot. Project is underway and scheduled for completion in Spring, 2010.
Renovation/alteration of the existing Showtime building and addition of a new building, approximately 35,000 total square feet. Phase One consisted of renovation of the existing 8,000 square foot wood frame commercial building to include ceiling and carpet replacement, painting, blew lighting, HVAC ductwork and diffusers. A portion of the asphalt shingle roof was removed and replaced to accommodate stairs and a handicap ramp. Phase Two consists of a 27,000 square foot metal building. Interior finishes of this phase include some block walled locker rooms in one corner of the space and a Zamboni and compressor room. Future Expansions are likely as permits allow for the addition to be up to 40,000 square feet. The Owner eventually wants to add a pool and outdoor recreation area to the complex as well. Projects is underway and scheduled for completion the end of September, 2009, in time for hockey season.